No. |
Name |
Preparation platform |
|
1 |
conveyor belt,67meters |
2 |
flat pulley |
3 |
skid type haul-off unit |
4 |
electrical automatic control system |
5 |
motor with belt wheel |
6 |
gear box |
7 |
guide wheel |
8 |
pulleys |
9 |
traction head,Φ19~Φ150 |
Vulcanization platform |
|
1 |
air-actuated clamp |
2 |
automatic telescopic device,control box |
3 |
steam ball valve,drain valve |
4 |
pressure gauge,accessories |
Testing system |
|
1 |
pump head(excluding hydraulic pump) |
2 |
track wheel |
3 |
high pressure valve,hose,gauge(excluding booster pump) |
Dyring system |
|
1 |
air blower |
2 |
air passage |
3 |
electrical cabinet |
Winding system |
|
1 |
single winder |
2 |
double winder |
If use stainless steel Gas separating tank , cost increases |
|
Field service charge( welding, drilling, assembling and painting) |
|